News 2011
#3 (69) June, 2011Теthys Petroleum
The British company Tethys Petroleum Limited, registered on the Channel Islands, has published the data on operations in Kazakhstan. As it is informed on the company's website, as a result of approbation of the exploration well АКD03, the commercial inflow of oil was received on the second oil bearing site.
The sandy layer in the upper Jurassic sediment opens a new complex on the Doris field, writes Кursiv. Operations on the appraisal wells AKD04 and AKD05 of the Doris field are conducted according to plan: well AKD04 should reach a design depth by early May of this year, and well AKD05 - by the end of May 2011.
These are the first wells the drilling of which will be conducted based on 3D seismic survey. Exploration well KULD01 on the block Kul-Bass should reach a design depth in June-July of this year, according to the source, informs RusEnergy.